13) Toxic Waste Coming to St.Helens OR

Toxic Waste Coming To St. Helens, OR? Are We Ready? By Steve Topaz
Past City Councilor Steve Topaz brought up the following regarding the proposed establishment of the City of St. Helens opening up the city for Toxic Waste Disposal at the current Waste Water Treatment Plant at the June 4th St. Helens City Council Work Session:
   No record of the council authorizing John Walsh to present to the Portland Harbor super fund St. Helens to be the site for toxic waste disposal
    No record of the proposal details
No record of the council approving St. Helens as a toxic disposal site
No record of DEQ informing the City of St. Helens of the Boise mill contamination study before the City of St. Helens bought the Boise property
Establish: DEQ did not allow the docks at the Boise Mill to be repaired for a satellite tugboat staging area
DEQ after studying the Boise waterfront contamination recommended a remediation plan that removed all dockage from this site and covered the near shore with an activated charcoal sand mixture
DEQ announced that it would not allow the channel from the river to the Scappoose landing area
DEQ announce that all contaminated areas along this channel would be left in place and covered
DEQ does not use cancer rates as an indicator when placing was dumps
NOAA and DIGMA information was not included when MFA reported it’s studies of the conversion of the cooling/sewer lagoon to a toxic waste dump.
Mohammed Zaher, Public Works Director contracted a consulting company to investigate and recommend how to update some of the sewer lines in St. Helens and they investigated the possibility of landslides and liquid fraction effecting this project. The state DOGAMI maps showed no problems with the sewer project, but did show a major problem with the present lagoon, future toxic waste dump
$20M has been funneled from FEMA through St. Helens to MFA to turn the cooling/sewer lagoon into a toxic waste dump
No public meeting has been held in the last 14 years to collect the citizen’s approval of this project  and questioning the illegal executive meetings where no media has been admitted against state letter being ignored by city legal council.
Things to consider:
History of the ground, Frogmore Slough to cooling – sewer treatment pond to toxic waste
    Superfund cleanup of the Portland Harbor, amounts and time
    Transportation processes needed
    Toxic waste handling at storage site
    Possible failures and resulting disasters
   Overview of the MFA studies and missing data
   Time lines for the Toxic waste project
Please comment or pm us on our Columbia County Directory fb page post or contact us through this website to engage with this current story. Check back for updates. Thank you.